Transportation

Palm Beach International Airport, Palm Beach County New 5,000 sq. ft. TSA Offices

HVAC, Plumbing and Electrical engineering design as required for new TSA offices at PBIA.

Design Completion Date: June 2007

Construction Completion Date: August 2008

Miami International Airport Building 3089 Park 8 Parking Garage

Electrical engineering/design/specify approximately 200 new emergency light fixtures throughout the building.

Design Completion Date: March 31, 2009

Construction Completion Date: December 2009

Port of Miami. Terminals B & C – 2nd Floor Modifications.

Two (2) new door openings at Cruise Terminal C for 2 new Passenger Boarding Bridges (PBB).

New Chase to enclose existing electrical and communications conduits and wires, demolition of existing interior walls, addition of new lighting fixtures, addition of new power center for new passenger bridge and addition of new interior walls in order to create new enclosure at # 9 East.

Design Completion Date: November 2009

Construction Completion Date: October 2010

Port of Miami. Terminals D and E. PAX Bridges and Photo Areas.

Passenger Loading Bridges (2)

Relocation/Replacement of existing fire sprinkler heads because of new ceiling, rework of existing HVAC ductwork and ac vents because of new ceiling, relocation/replacement of existing light fixtures because of new ceiling and relocation of emergency exit lights because of new ceiling.

Photo Areas (2)

Relocation/Replacement of existing fire sprinkler heads because of new ceiling, rework of existing HVAC ductwork and ac vents because of new ceiling, addition of new light fixtures in new ceiling and relocation/replacement of emergency exit lights because of new ceiling. New door openings (2) Extension of electrical power, fire alarm devices and empty conduits for communication as needed to new doorways.

Design Completion Date: December 2008