Overtown Transit Village South 1st and 2nd Floor Tenant improvements.
Perform mechanical and electrical engineering design as required for tenant work on the 1st (Court Child Care Center, Mail Room, Offices and Corrections/Federal Agents gun locked Room) and 2nd (5 Courtrooms and associated Offices, 2 detention cells, Interview area, Waiting area and Conference Room) floors at the Overtown Transit Village South high rise office building as follows:
New VAV Boxes, new AHU chilled water cooling coils, new exhaust fans for restrooms and detention cells, new plumbing, smoke evacuation system modifications, new supply, return and exhaust ductwork and new EMS controls, new lighting, new receptacles, new fire alarm system to provide coverage to all new spaces and new IT rooms. New data and security system infrastructure was also provided as required for the new Courtrooms and associated offices.
Design Completion Date: March 2010 .
PROCON role in Project – Sub-Consultant
Miami-Dade Oak Grove Park.
New lighting system.
Engineering/design of new lighting system and associated electric power for existing and new parking lot and walkways.
Design Completion Date: August 2007
Miami-Dade International Gardens Park.
New lighting system.
Engineering/design of new lighting system and associated electric power for new walkways.
Design Completion Date: September 2007
PROCON role in Project: Sub-Consultant
Turner Guilford Knight (TGK) Detention Center Kitchen Air Conditioning and Chiller/Tower Replacement Project
Existing kitchen is presently being provided with 100% ventilation air from an existing air handling unit located on the roof of the storage room which is part of the kitchen. Said unit has a hot water coil, and filters. Under this project, the ventilating air handling unit will be removed and replaced with two new air handling units. One air handling unit will provide pre-conditioned make-up air to the kitchen hoods. The second air handling unit will provide conditioned air to the entire kitchen (replacing 100% ventilation). Since there is little room in roof, the two new air handling units mentioned herein will be housed in “one” common housing (custom engineered).
Design Completion Date: May 2014
PROCON role in Project: Prime Consultant
Miami-Dade Housing Authority Twin Lakes Elderly Housing at 1221 NW 95th Street. Exterior Lighting Upgrade to meet 40 year electrical re-certification.
Engineer/design/specify new light poles and new light fixtures as required in order to properly illuminate existing Parking Lot and exterior walkways, electric power for new light fixtures and perform photometric calculations for new lighting layout to make sure it meets Miami-Dade County requirements of 1 foot candle minimum.
Design Completion Date: January 2012.
PROCON role in Project – Sub-Consultant
Pre-Trial Detention Center/Graham Building, Miami-Dade County Major Chilled Water Plant Upgrades
Mechanical/Electrical Engineering design in order to replace two (2) existing 375 ton each centrifugal chillers with two (2) new 550 ton each chillers, condenser water pump replacement, new variable flow primary chilled water pumps, new automation controls for entire plant, new underground chilled water pipes to connect adjacent Graham building, new variable frequency drives for existing cooling tower fans, Ashrae 15 compliance and new electric feeders for new chillers.
Design Completion Date: March 2005
PROCON role in Project: Sub-Consultant
Gerstein Dade County Courthouse Chilled Water Plant Expansion
Mechanical/Electrical engineering design in order to add a 430 Ton Screw chiller, variable frequency drives for tower fans and chilled water pump replacement in large existing chilled water plant. Complete automation of the plant was also engineered and new electric feeders for new chiller were also provided as part of this project.
Design Completion Date: April 2005
PROCON role in Project: Sub-Consultant
David Dyer Miami Federal Courthouse, Miami-Dade County Major Chilled Water Plant Retrofit
Mechanical/Electrical design in order to retrofit existing 400 ton chilled water plant as follows:
Two existing centrifugal chillers sized 240 and 160 tons each were removed and replaced with two high efficiency new centrifugal chillers sized 350 tons each.
Present plant operation required the running of both existing chillers to meet building peak cooling load. New chillers were sized in such a way that only one chiller will run during the entire year. The other chiller will be for stand-by use only. Two existing condenser water pumps were removed and replaced with two new ones properly sized (one pump for stand-by use only).
Design Completion Date: March 2005
PROCON role in Project: Sub-Consultant
Key West Federal Courthouse, Monroe County United States Marshall Services Building Addition, new main electric switchgear and new service voltage for complex.
HVAC, Electrical and Plumbing engineering and design as required for this building addition consisting of six (6) holding cells, vehicle sally port, elevator, processing room and storage room. New security system infrastructure design as per GSA specifications.
Removal of old main electric switchgear and replacement with new one located above the 100 year flood level and change building service voltage from 208 volt to 480 volt. Installation of new electric panelboards fed from new switchboard in order to provide power to the new Building addition.
Design Completion Date: July 2005
PROCON role in Project: Sub-Consultant