Jackson Memorial Hospital, West Wing Critical Care Unit (CCU-B) Renovation/Expansion and 9th floor patient rooms.
4th FL CCU-B Renovation/Expansion: (This project was reviewed and approved by AHCA and ICRA drawings were prepared by PROCON).
100% gut out of the existing space in order to create new CCU-B. New CCU-B consisted of eight (8) beds, one of which was a VIP room and one (1) was an airborne isolation room, clean utility room, soiled utility room, conference room and a centralized nurses station.
New M/E/P systems included the following:
New light fixtures, new plumbing fixtures, new air conditioning diffusers, new constant air volume boxes with hot water heaters, new fire sprinklers (existing space was not fire sprinklered), new exhaust fan and space pressure monitor for isolation room, new nurse call system, new patient monitors, new vertical patient head walls, new electric panels, new electric step-down transformers, new ductwork (high and low pressure), new piping and new controls.
The new Nurse Call System consisted of the following:
New master station for CCU-B and adjacent CCU-A (adjacent CCU-A was connected to this master station installed in CCU-B), Code Blue emergency stations, staff stations, duty stations, annunciator panels, single patient stations, corridor dome lamps and emergency pull cord stations in restrooms.
9th FL Patient Rooms:
Provided a total of twelve (12) duplex receptacles: one (1) beside each patient bed for new patient monitors (furnished and installed by others) on emergency power and added one (1) new electric panel. Provided one (1) voice, one (1) data and one (1) electrical outlet in each alcove for crash carts. Also provided a total of six (6) voice/data outlets, one (1) per patient room mounted at 54”AFF.
Design Completion Date: May 2010
PROCON role in Project: Sub-Consultant
South Miami Hospital Cath Lab Outlets Project
Engineer/design/specify the installation of 3 new 208 Volt outlets (One new outlet per room) in 3 Cath Rooms at Invasive Heart Center (North Tower 2nd floor).
These outlets will be used to plug in Life Support equipment such as heart/lung equipment etc.
These 3 new outlets will be connected to Critical Panel 2CL2B (120/208V, 3ø, 4W) located in the same Cath Lab check control area.
New 2 pole, 20A circuit breakers will be installed in this panel.
Design Completion Date: April, 2012
PROCON role in Project: Prime Consultant
South Miami Hospital PBX Room UPS Replacement
Replaced existing Liebert UPS that serves the telecom system for South Miami Hospital in PBX Room with a new 40KVA UPS/PDU. Re-connected new UPS/PDU from central energy plant critical power panel “CDPA”. Removed (3) non-code compliant, existing 120/208 panels “LS2-PBX”, “PBX1” and “LS1” and transferred their associated loads to new PDU panels. Panel “PBX-8” (which was completely empty) will also be removed. Relocated existing public address system rack to replace it with UPS.
Provided temporary power from Critical Power panel to temporary UPS’s thru rack mounted receptacles.
Design Completion Date: April, 2012
PROCON role in Project: Prime Consultant
South Miami Hospital, Pavilion Building Visicu Camera Move
(This project was reviewed and approved by AHCA and ICRA drawings were prepared by PROCON).
Electrical Engineering design to remove existing Visicu System from the North Tower 2nd Floor CVCU Rooms 1, 8, 9, 10, 11 and 12 and re-install existing visicu cameras with micropone on the 4th floor (rooms 408, 420, 423, 424, 425 and 426) of the Pavilion Building. The rest of the Visicu System components such as e-lert button, monitor, AV server and ceiling mounted speaker will be new and also installed in 4th floor rooms mentioned before.
Design Completion Date: October 2010.
PROCON role in Project: Consultant
Baptist Hospital of Miami BCVI Sonic Washer Replacement
Electrical and Plumbing Engineering design to remove existing washer machine and replace with a new Sonic Washer Machine. All provisions to install new Sonic Washer machine were considered. Existing domestic cold and hot water piping was modified with necessary changes to accommodate new Sonic Washer, existing filters for cold and hot water were re-used and new floor drain was added to meet the requirements of the new sonic washer.
Power for the old washer machine was re-used, however, an existing disconnect switch that was powering the old washer machine was removed.
Design Completion Date: November 2010.
PROCON role in Project: Consultant
South Miami Hospital New Permanent Load Bank Generator
Provided Electrical engineering and design services for the installation of a new permanent 250KVA, 208V, 3Ø Load Bank in a weather proof enclosure outside existing generator room connected to existing Emergency Switchboard “EDP”. A new 3-pole 800A circuit breaker and new conduits and wire were also installed in existing EDP.
Design Completion Date: October 2014.
PROCON role in Project: Prime
HH eICU Integration into PCU
Provided Electrical engineering/design services and ICRA drawings for the installation of new Philips Visicu Equipment on 2nd floor rooms PEDS 1, 2, 3, 4, 5, 6 and 7. The equipment consisted of one (1) camera/microphone, one (1) monitor with bracket, one (1) ceiling speaker, one (1) wall mounted alert button and one (1) A/V server per room. Equipment also required the installation of new power and data outlets as well as backing for monitor installation.
Design Completion Date: July 2014
PROCON role in Project: Prime
HH 16 KVA UPS Install
Provided Mechanical/Electrical engineering/design services and ICRA drawings for the installation of new 16 KVA UPS in rooms Admin 1 North, Admin 2 North, Admin 3 North, Main 3 Central, Main 4 Central, Main 5, Main 3 West, Main 2 West, Main 2 Central, Main 1 Central, Main 1 West, Engineering 1 North and Engineering 1 South. New 16 KVA UPSs were placed in same IT room but different location as existing UPSs so that there would be no UPS power interruption.
Design Completion Date: September 2014
PROCON role in Project: Prime
BHE Galloway Endoscopy Center HVAC Replacement
Provided Mechanical, Electrical, Structural engineering/design services and ICRA drawings for the replacement of existing 7.5 ton DX split AC Unit and 30 Ton DX Packaged Rooftop AC Unit with new ones that serve the entire Endoscopy Suite. Also, new exhaust fan, associated supply and exhaust duct and electric duct heater were added to Endoscope cleaning room in order to eliminate unwanted odors. Due to the replacement of the units new circuit breaker and new conduit and wire were necessary to feed new Fan Coil Unit from existing Panel C. New breaker was also required to connect new DX packaged Rooftop AC Unit.
Design Completion Date: January 2015
PROCON role in Project: Prime